Chan Thar Shwe May Project
Water Supply Pump System with Control Panel
Completed in 2017 using premium Maxon (Indonesia) pumping equipment.
Project Overview
Omni Flow System Co., Ltd. successfully supplied a complete water supply pump system with control panel for the Chan Thar Shwe May Project. The project included engineering support, equipment supply, warranty service and preventive maintenance.
The pumping system was designed to provide reliable water supply, stable pressure and efficient operation for the entire development.
- Complete pump system solution
- Premium Maxon equipment
- Advanced control panel
- Full warranty & maintenance
Project Information
Key details about the Chan Thar Shwe May water supply project
Project
Chan Thar Shwe May
Category
Water Supply Pump
Brand
Maxon (Indonesia)
Completed
2017
Equipment Specification
Detailed technical specifications for all supplied equipment
| Equipment | Specification | Quantity |
|---|---|---|
| Transfer Pump | Horizontal End-Suction Pump, 45 kW, 2900 RPM | 4 Sets |
| Booster Pump | 2 CM 8-40, 1.5 kW, 2900 RPM | 2 Sets |
| Submersible Pump | Non-Clog Type with Auto Coupling, 2.2 kW, 2900 RPM | 2 Nos |
| Tube Well Pump | Borehole Submersible Pump, 7.5 kW, 2900 RPM | 1 No |
| Pressure Tank | 100 Litres, Maximum Working Pressure 10 Bar | 2 Nos |
Scope of Work
Comprehensive services delivered for this project
Supply
Supply of complete water supply pumps and pressure tanks.
Control Panel
Complete control panel solution for automatic pump operation.
Engineering
Pump selection, technical support and system integration.
Maintenance
Warranty support and preventive maintenance services.
Project Gallery
Visual documentation of the installation and equipment
Dual VSD Drive Booster Set
Submersible Tube Well Pump
Transfer Pump Installation
Project Overview
Need a Similar Water Supply System?
Our engineering team is ready to design and supply reliable water pumping solutions for residential, commercial and industrial developments.
Contact Omni Flow

